Home   |   Industries   |   Water & Wastewater

Water & Wastewater

Sustain Pumping and Treatment Through Utility Interruptions

Water infrastructure relies on a sequence of electrical loads, from lift-station pumps to aeration equipment and process controls. Standby generation must account for how those loads start, operate, and recover after an interruption.

GenTek USA supplies generators and transfer equipment, coordinates temporary power, and services the generator assets supporting water and wastewater operations.

Pumping Continuity

Treatment Process Support

Plan for Motor Starting and Process Priorities

Pump ratings alone do not establish the generator requirement. Starting methods, simultaneous demand, operating sequences, and the loads that must remain available all influence selection.

We review the proposed scope with operations and electrical personnel, including lift stations, treatment processes, and distribution pumping. That review establishes the connection requirements and priorities for equipment selection.

A Transfer Path for Essential Treatment Loads

In this arrangement, an automatic transfer switch connects a natural gas generator to the selected treatment loads when utility power is unavailable. Pumps, blowers, and controls form distinct demands on the supply. The actual load sequence and motor-starting requirements determine the capacity and transfer configuration.

Illustrative configuration only. Each system is designed around the project’s power requirements, site conditions, and operating needs.

Permanent and Temporary Power

Keep Distributed Generator Assets Serviceable

Water systems may depend on generators spread across several operational sites. Consistent equipment records, site contacts, and scheduled visits help operators track conditions across that network.

Our maintenance and testing work documents completed service, operating observations, and deficiencies requiring repair. Access and work windows are coordinated with the people responsible for each site.

Prepare the Power Scope for Your Next Upgrade

Include the pump schedule, existing transfer arrangement, and anticipated interruption window when planning a generator replacement or facility expansion.

Water & Wastewater Power FAQs

Yes, when the generator is selected for the actual application. Motor size, starting method, simultaneous loads, and acceptable voltage and frequency variation are part of the review.

We can discuss both individual sites and facility-wide requirements. The equipment and service scope depend on the loads, access, existing transfer arrangement, and operating objectives.

Yes. We review the required capacity, connection arrangement, work schedule, and site access to plan rental support during the replacement window.

A load list, system voltage and phase, motor details, existing generator and transfer switch information, site location, and anticipated operating duration are useful starting points.

Yes. Service agreements can cover multiple assets, with scheduling coordinated around access, operating requirements, and equipment condition.

Supporting Services

Contact Us

Share the pumping loads, facility locations, and generator assets your operations team manages.