Generation Behind Critical IT and Cooling Loads
A data center’s generator plant must be considered alongside UPS systems, transfer arrangements, cooling demand, and the facility’s redundancy strategy. Capacity alone does not establish how that system will respond to a utility interruption.
GenTek USA supplies generator and transfer equipment and provides installation, maintenance, testing, repairs, and rental power support within the scope established by the facility and its engineering team.
Reliable Backup Power
Maintenance & Testing
Coordinated Technical Support
Preserve the Required Capacity During Maintenance
Taking one generator out of service changes the capacity available to the facility. Maintenance and replacement plans need to account for that change, the supported load, and the conditions under which work may proceed.
The review establishes the affected equipment, operating restrictions, transfer and control interfaces, and any temporary power requirement. Those details guide the service scope and the work window.
Coordinate the Generator Scope with the Electrical Design
Equipment selection and field execution must follow the intended operating architecture. GenTek coordinates generator and ATS supply, installation, startup, and commissioning against the defined project requirements.
For existing installations, diagnostics, preventive maintenance, load bank testing, and compatible monitoring provide information about generator condition and the work needed to address deficiencies.
Parallel Generation Within the Power Architecture
The illustrated generator units connect through paralleling switchgear to the data center distribution system. Generation supports sustained electrical demand while UPS systems serve their assigned role in the facility architecture. Capacity, redundancy, load sequencing, and cooling requirements determine the actual arrangement and its operating procedures.
Illustrative configuration only. Each system is designed around the project’s power requirements, site conditions, and operating needs.
Installed Capacity and Maintenance Contingencies
Permanent generation supports the facility’s design duty. Temporary equipment may address a defined maintenance or replacement interval, subject to the available connection arrangement and required capacity.

Industrial Generators ›
Generator equipment for standby and backup power requirements.
- Equipment sourcing and selection
- Automatic transfer switches
- Installation, startup, and commissioning

Rental Power Solutions ›
Temporary generator support for planned work, outages, and changing facility needs.
- Rental generator equipment
- Delivery and site coordination
- Support during maintenance and repair
A Defined Interface for Equipment and Field Work
Generator projects involve equipment, connections, controls, testing, and ongoing service. Establishing those responsibilities within a coordinated scope helps facility teams manage the work against their operating procedures.
GenTek supports procurement, field execution, and service requirements while the facility and design team establish the system architecture, redundancy objectives, and acceptance criteria.
Test Against a Documented Objective
Load bank testing evaluates generator behavior under controlled demand. The plan should identify the load profile, duration, readings, and operating limits required for the test. Transfer functions and wider system sequences require their own defined checks where included in the project scope.
Carry Equipment Findings into the Next Work Window
Service findings should identify the condition observed, the corrective action proposed, and the verification needed after repair. This gives operations teams a basis for scheduling work against capacity and availability requirements.
Maintenance, repairs, and temporary generation can then be coordinated around the facility’s approved work sequence.
Data Center Generation FAQs
Can GenTek support an existing data center generator system?
Yes. Our services include preventive maintenance, diagnostics, repair, load bank testing, monitoring, and emergency support. We review the equipment and requested scope with your facility team before scheduling work.
Can you provide temporary power during maintenance?
We provide rental generator support for planned work and unexpected outages. Equipment selection and deployment depend on required capacity, site access, connection arrangements, duration, and availability.
Do you supply generators and automatic transfer switches?
Yes. GenTek can supply generator and ATS equipment and coordinate installation, startup, and commissioning within an agreed project scope.
Can you support redundant backup power requirements?
We can work with your facility and engineering teams to identify generator equipment and service requirements for the planned redundancy strategy. System configuration, capacity, and operating sequences must be confirmed against the project design.
How is testing coordinated around live operations?
We establish the test scope, schedule, access requirements, and operating constraints with your team before work begins. Findings and recommended follow-up are communicated after testing.
Related Solutions
Measure generator response under defined electrical demand within the approved test window.
Make supported generator status and alarm information available between onsite inspections.
Investigate starting, output, and control faults within the facility’s work-control procedures.