Jobsite Generation from Mobilization to Handover
Construction schedules often move ahead of permanent electrical service. Temporary generation must support the equipment in use today while allowing for the loads and access constraints introduced by the next phase.
GenTek USA coordinates rental generators for active jobsites and permanent generator supply, placement, startup, and commissioning for the completed facility.
Jobsite Power Availability
Phased Project Coordination
Build the Rental Scope Around the Work Sequence
Tools, site offices, lighting, and temporary facilities do not all operate on the same duty cycle. Combined running demand, equipment starting loads, and the daily work schedule inform generator selection.
We review the load list, voltage, distribution arrangements, placement, and delivery access with the project team. Changes in capacity or rental duration are evaluated as the job develops.
Permanent and Temporary Power

Permanent Equipment for the Finished Facility ›
Generator and automatic transfer switch supply with installation and commissioning support for the completed project.
- Equipment aligned with project specifications
- Logistics and placement coordination
- Startup, testing, and continuing service support

Rental Generation for the Jobsite ›
Temporary power for construction activity, temporary facilities, and work awaiting utility service.
- Capacity selected around equipment and operating duty
- Delivery coordinated with site conditions
- Service support and rental extensions reviewed as needed
Distribute Temporary Power Across the Work Areas
A towable generator supplies the temporary panels shown in this jobsite arrangement, distributing power to tools, lighting, work areas, and the site office. Panel locations and cable routes must follow the actual work zones and access requirements. The generator and distribution scope should be revisited as construction phases change.
Illustrative configuration only. Each system is designed around the project’s power requirements, site conditions, and operating needs.
Sequence Delivery, Connections, and Commissioning
Generator delivery depends on more than a date. Access routes, ground conditions, lifting requirements, placement space, and connection readiness determine when equipment can be installed.
For the permanent system, we coordinate the assigned installation and startup scope with the project schedule so testing and handover requirements are addressed before closeout.
Establish Power Requirements Before Mobilization
Send the load list, required start date, operating hours, and site logistics. Identify the permanent-system milestones if generator installation is also part of the project.
Construction Power FAQs
Can we rent a generator before utility service is available?
Yes. Share the expected loads, voltage, phase, daily operating hours, and anticipated rental duration so we can review the application.
Can the rental arrangement change as construction progresses?
Yes. Changes in equipment, capacity, or rental duration can be reviewed with our team, subject to equipment availability and the revised scope.
Can one generator operate several pieces of jobsite equipment?
Potentially. The combined running load, starting demand, operating sequence, and distribution arrangement must be evaluated together.
Do you coordinate delivery and placement?
Yes. Access, ground conditions, placement space, and any special handling requirements are reviewed as part of the logistics scope.
Can you supply and commission the permanent generator too?
Yes. We provide generator and ATS equipment, installation coordination, startup, and commissioning support within the agreed project scope.
What information helps you prepare a rental proposal?
Provide the site address, required start date, load list, voltage and phase, daily operating hours, expected duration, and available information about connections and site access.
Supporting Services
Coordinate permanent generator placement, connections, startup, and commissioning with project milestones.
Arrange generator fault assessment when an equipment issue interrupts active site work.
Evaluate permanent generator performance under controlled load within the project test scope.
Contact Us
Align rental deployment and permanent generator milestones with the construction schedule.