Practical guidance for buying, selling and choosing a generator. Understand your power requirements, compare equipment and prepare your business for the next outage.
Evaluate the Equipment and the Application
The right generator must match your equipment, operating schedule and site. Purchase price is only one part of the decision. Starting loads, voltage, fuel supply, installation and service support all affect what the system will cost and how it will perform.
Use these guides to compare new and used generators, plan temporary power, prepare for hurricane season or put together the information needed to sell your equipment.
New or Used Generators: What Should You Buy?
Buy for the application, then compare condition and total cost. New equipment can offer current controls, a defined warranty and a configuration suited to your project. Used equipment may reduce the initial investment or shorten delivery time, but its history and condition need closer review.
- Match the nameplate rating, voltage, phase, frequency and fuel to the site.
- Request serial numbers, operating hours, service records and a recent load test report. Hours alone do not establish condition.
- Inspect for corrosion, leaks, damaged wiring, cooling problems and evidence of poor storage. Ask a qualified technician to assess the engine, alternator and controls.
- Confirm parts availability, warranty exclusions and exactly what accessories are included.
A test showing stable operation under a documented load is more useful than a video of the engine idling. Compare the delivered and installed cost, including any repairs, before choosing the lower asking price.
What Size Generator Does Your Business Need?
Start with a load list, not the main breaker size. Record each essential load, its running demand, voltage, phase and starting requirements. Identify what must run together and what can be started in sequence or left off.
- Separate running kW from starting demand. Motors, pumps and compressors may determine the generator size even when their running load is modest.
- Match voltage, phase and frequency. A three phase rating does not automatically apply in single phase operation.
- Check both kW and kVA. At 0.8 power factor, 100 kW equals 125 kVA; that conversion alone does not size a generator.
- Select the correct standby or prime rating for the operating duty. Check the manufacturer’s limits and site derating for temperature and altitude.
Have the supplier evaluate load steps, voltage and frequency dip, nonlinear loads and planned growth. A fixed percentage of spare capacity cannot replace that review.
Diesel or Natural Gas: Which Fuel Fits Your Site?
Compare fuel availability during the outage you are planning for. Diesel stores energy on site, but runtime depends on usable tank capacity and refueling access. Pipeline natural gas avoids routine tank deliveries, but the generator depends on adequate gas pressure, flow and continued supply.
- For diesel: Confirm consumption at the expected load, usable fuel volume, storage condition and delivery arrangements. Include fuel maintenance in the ownership budget.
- For natural gas: Have the gas provider and installer verify meter capacity, piping and pressure under load. Do not assume an existing gas connection can support the generator.
- For either fuel: Compare the actual model’s starting performance, service requirements, fuel cost and site installation needs.
Do not choose from fuel price alone. Ask how the system will keep operating if roads are blocked, fuel deliveries are delayed or utility gas service is interrupted. Confirm applicable installation and operating requirements with the project team.
Rent or Buy: Compare the Full Cost of Power
Renting often fits a defined project, planned shutdown or temporary need. Buying may make sense when the equipment will be used repeatedly or must remain dedicated to your site. Compare both options over the same period and expected operating hours.
- Rental budget: Equipment rate, included hours, excess hours, delivery, pickup, cable, distribution, connection labor, fuel and any required coverage.
- Ownership budget: Purchase, freight, installation, financing, maintenance, repairs, testing, storage and eventual resale value.
- Availability: A rental quote is not necessarily a reservation. Confirm emergency availability, mobilization terms and who handles service and refueling.
A weekend event and an ongoing production site have different economics. Ask for an itemized scope so the rental and purchase options cover the same power requirement and support responsibilities.
Selling a Used Generator: What Buyers Need to Know
A complete equipment file makes the evaluation easier. Gather clear photos of the nameplates, controller hours, engine, alternator, enclosure, breaker, fuel tank and trailer if fitted.
- Record the make, model, serial number, year, kW/kVA, rating, voltage, phase, frequency and fuel type.
- Provide service records, recent test results, known faults and the reason for selling. State whether the unit is installed, disconnected or ready to load.
- List included accessories such as the transfer switch, tank, trailer, battery charger and manuals.
- Confirm ownership, equipment location, removal access, lifting requirements and who pays for disconnection and transport.
Value depends on condition, configuration, demand and the cost to make the unit ready for its next owner. Asking prices are not completed sale prices, and low hours do not guarantee a higher value. Get the offer and included scope in writing before agreeing to removal.
Before Delivery: Installation and Ownership Checklist
An equipment purchase is not automatically a complete installation. Agree on responsibilities before the generator ships so missing work does not delay startup.
- Site readiness: Confirm access, lifting, foundation or placement, flood exposure, ventilation, exhaust clearances and service space.
- Electrical scope: Identify who supplies the transfer equipment, cables, distribution and connection work. Have the electrician verify compatibility and required approvals.
- Fuel scope: Confirm the tank or gas service, fuel piping, initial fill and commissioning requirements.
- Acceptance: Agree on startup, load testing, transfer testing, operator instruction and the documents handed over.
- Ownership: Record warranty terms, maintenance intervals, consumables, service contacts and inspection responsibilities.
Use the manufacturer’s maintenance schedule and applicable site requirements. A generator that starts during an exercise cycle has not necessarily demonstrated that it can support the building’s load.
Hurricane Preparedness
Build your outage plan before a storm enters the Gulf. A generator is only one part of the plan: your business also needs a safe connection, dependable fuel and people who know what to do.
1. Record your essential loads.
List the equipment that must operate, its voltage and phase, and any large motor starting loads. Have an electrician confirm the connection point and required capacity.
2. Arrange equipment and site access.
Confirm rental availability and reservation terms in writing. Record the delivery route, placement area, cable distance and who can authorize mobilization. Keep equipment clear of flood exposure and building air intakes.
3. Plan fuel and service.
Estimate runtime using usable fuel and consumption at the expected load. Set a refueling schedule, confirm delivery access and assign someone to monitor fuel, operating hours and alarms. Test the generator and transfer arrangement before storm season.
4. Keep one site information sheet.
Include the site address, decision maker, electrician, generator supplier, fuel supplier, voltage, phase, connection details and load list. Keep a printed copy where the response team can find it.
Portable generator safety: Operate outdoors at least 20 feet from doors, windows and vents, with exhaust directed away. Never backfeed a building through an outlet. Have a qualified electrician provide the correct transfer equipment. Flooded electrical equipment requires inspection before energizing.